Skip to content Skip to footer

Istanbul Airport Metro – PAKS Maintenance

Istanbul Airport Metro - PAKS Maintenance

Miralis Engineering is the authorized maintenance contractor for the Istanbul Gayrettepe - New Airport Metro Line.

Ongoing

As of 2023, Miralis Engineering has begun maintenance work at 9 different stations on the Istanbul New Airport Metro Line, with 2 platforms at each station.

PSD systems play a critical role in passenger safety and operational continuity on the line. Miralis Engineering implements preventive maintenance strategies to ensure the system operates at maximum efficiency, preventing potential failures before they occur.

Our technical teams in the field work in full coordination with SCADA and train control centers, immediately detecting and resolving any potential technical issues. This ensures the system's continuous operability and keeps passenger satisfaction at the highest level.

5

Programs

18

Locations

Ongoing

05/02/2023 — 6:49 PM